Comic 241

From BNSwiki
(Difference between revisions)
Jump to: navigation, search
m (Reverted edits by Ckunderwear (Talk); changed back to last version by Pcj)
m
 
Line 1: Line 1:
__NOTOC__
+
<h1>[http://www.iscaffold.com.cn scaffolding]</h1>
[[Image:241_3.png|frame|Steve SPEW!s digestive organs on a villain!]]
+
'''Link:''' {{Comic|241}}
+
  
'''Translations:''' {{Translations}}
+
    First, building comprehensive <b>[http://www.iscaffold.com.cn scaffolding]</b> outside the building floor by floor area calculated above. Building height refers to the design of the outdoor terrace to the eaves height. Scaffolding their basement floor area calculation.
 +
     
 +
    Second, full house cast reinforced concrete foundation strip width is greater than 3.0m of the base, can be calculated by full house foundation area based scaffolding, without deduction of the wall area occupied, or an additional transport channel based outside the area.
 +
     
 +
    Third, the vertical protective frames, the natural floor to the top layer between bar height multiplied by the actual erection erection length, area calculation.
 +
     
 +
    Fourth, in the scaffolding by the vertical projection area of the wall.
 +
     
 +
    Fifth, other structures of the scaffolding:  
  
'''Title:''' colonic irritation
+
    Sixth, building by building vertical closed network perimeter length multiplied by the design of outdoor floor to eaves height to floor area. Parapet or cornice height of more than 1.2m, and its height can be considered closed network to the top of the parapet wall or cornice. Add a bamboo vertical closed network scaffold board, high increase of less than 30m bamboo scaffold board 0.30 m2, 20m higher wire 0.07kg each other to increase the bamboo scaffold board 0.009 m2, wire 0.002kg, man 0.006 man-days, other machinery costs 0.01 yuan.
  
'''Date:''' [[November]] 28, 2006
+
    Seven additional layer of old buildings in floor construction scaffolding costs include comprehensive scaffolding, the external walls of old buildings double scaffolding. Plus a comprehensive scaffolding story building floor area by adding layer after layer applied to the corresponding canopy plus a comprehensive scaffolding of a fixed high. External walls of old buildings double scaffolding, no matter whether the outer wall of the old buildings the new decoration, according to the length of the old buildings outside the old building eaves height multiplied by the vertical projection area, high canopy cover according to the corresponding fixed by double scaffolding Calculation of a factor of 0.5.
  
'''Summary:''' Beaver and Steve are confronted by a villain. Steve demonstrates the defensive mechanism of sea cucumbers.
+
  Jan. 10 more knowledge of scaffolding and <b>[http://www.iscaffold.com.cn aluminum beam]</b> description, please visit this site and the <b>[http://www.iscaffold.com.cn/bbs scaffolding bbs]</b> to the website: http://www.iscaffold.com.cn 24 hour customer service phone!
 
+
'''Cast:''' [[Beaver]], [[Steve]], [[Mugger]], [[Sea Cucumber]]
+
 
+
'''[[:Category:Onomatopoeias|Onomatopoeias]] used:''' "[[BRANDISH|BRANDISH!]]", "[[SPEW|SPEW!]]"
+
 
+
'''"[[Fin]]" style:''' Written in digestive organs.
+
 
+
'''Number of panels:''' 6
+
<br clear="all" />
+
==Transcript==
+
 
+
======Panel 1======
+
 
+
Beaver and Steve are walking down an alley when they are confronted by a mugger BRANDISH!ing a knife!<br />
+
Mugger: "Grr! Gimme yer wallets!"<br />
+
Beaver: "Oh no! We are confronted by a villain!"<br />
+
Steve: "Don't worry Beaver, I'll get us out of this with a little trick I picked up from nature's most cunning creation:"
+
 
+
======Panel 2======
+
 
+
A brown, slug-like creature is shown surrounded by blue rays of light and multi-colored stars.<br />
+
Steve (off stage): "THE SEA CUCUMBER"<br />
+
Sea Cucumber: "Purr!"
+
 
+
======Panel 3======
+
 
+
Steve SPEW!s digestive fluid and organs on the mugger!<br />
+
Mugger: "Akh!"
+
 
+
======Panel 4======
+
 
+
Beaver: "You - You expelled your digestive organs onto him?"<br />
+
Steve: "To distract him while we make our escape!"<br />
+
The mugger is laying on the ground, covered in digestive fluid and organs.<br />
+
Mugger: "Groo..."<br />
+
Steve: "Nature has so much to teach us."
+
 
+
======Panel 5======
+
 
+
Steve: "But don't you need those? You know, to live?"<br />
+
The mugger is now standing, dripping digestive fluid and entangled by a pink digestive organ.<br />
+
Mugger: "Gross"<br />
+
Steve: "Hmm..."
+
 
+
======Panel 6======
+
 
+
Steve: "Well technically speaking they are not exactly 'my' digestive organs..."<br />
+
Beaver examines the stitched up wound on his abdomen.<br />
+
Beaver: "This explains why I woke up in a bathtub full of ice this morning..."<br />
+
Beaver: "I knew I recognized that [[Wikipedia:ileum|ileum]]."<br />
+
Mugger (off stage): "Ew! Partially digested wood shavings!"
+
 
+
==Fun Facts==
+
 
+
* Beaver can live without digestive organs
+
 
+
==References==
+
 
+
None.
+
 
+
{{ComicPageNav|prev=240|next=242}}
+
 
+
[[Category:Comics]]
+

Latest revision as of 01:44, 11 January 2011

scaffolding

   First, building comprehensive scaffolding outside the building floor by floor area calculated above. Building height refers to the design of the outdoor terrace to the eaves height. Scaffolding their basement floor area calculation. 
     
   Second, full house cast reinforced concrete foundation strip width is greater than 3.0m of the base, can be calculated by full house foundation area based scaffolding, without deduction of the wall area occupied, or an additional transport channel based outside the area. 
      
   Third, the vertical protective frames, the natural floor to the top layer between bar height multiplied by the actual erection erection length, area calculation. 
     
   Fourth, in the scaffolding by the vertical projection area of the wall. 
     
   Fifth, other structures of the scaffolding: 
   Sixth, building by building vertical closed network perimeter length multiplied by the design of outdoor floor to eaves height to floor area. Parapet or cornice height of more than 1.2m, and its height can be considered closed network to the top of the parapet wall or cornice. Add a bamboo vertical closed network scaffold board, high increase of less than 30m bamboo scaffold board 0.30 m2, 20m higher wire 0.07kg each other to increase the bamboo scaffold board 0.009 m2, wire 0.002kg, man 0.006 man-days, other machinery costs 0.01 yuan. 
   Seven additional layer of old buildings in floor construction scaffolding costs include comprehensive scaffolding, the external walls of old buildings double scaffolding. Plus a comprehensive scaffolding story building floor area by adding layer after layer applied to the corresponding canopy plus a comprehensive scaffolding of a fixed high. External walls of old buildings double scaffolding, no matter whether the outer wall of the old buildings the new decoration, according to the length of the old buildings outside the old building eaves height multiplied by the vertical projection area, high canopy cover according to the corresponding fixed by double scaffolding Calculation of a factor of 0.5. 
 Jan. 10 more knowledge of scaffolding and aluminum beam description, please visit this site and the scaffolding bbs to the website: http://www.iscaffold.com.cn 24 hour customer service phone!
Personal tools
Namespaces
Variants
Actions
wiki navigation
site navigation
Toolbox